Level III Door Engineering

Portfolio/
Hangar Doors

Level III
    Rocky Mountain Level III
  • Location: Jefferson County Airport, CO
  • Date Completed: 1999

Door Engineering’s TP500, five top track One Piece Tip-Up Canopy hangar door. The Tip-Up Canopy system maximizes the available space of the hangar building. This door’s opening is 120’-0” wide by 32’-0” high (30’-0” clear height).

Gallery

Level 3 Level 3 Level 3r Level 3
  • Level 3
  • Level 3
  • Level 3
  • Level 3